|
 |
ATTACHMENT TO
|
CERTIFICATE No. MED031119XA
|
|
|
|
|
|
|
|
|
|
|
|
|
| Place of unit verification |
|
|
|
| Barcelona,, |
|
|
|
Verified components of the equipment (with serial
number) |
|
|
|
| Open loop system 16-047-APV/18-340-MAR (destined to COSTA MEDITERRNEA for D/G n.6) |
|
|
|
|
|
|
|
| Technical documentation |
|
|
|
HMMC-13220: Scrubber System PIDs; HMMC-13302: Emission Compliance Plan; HMMC -13303: Onboard Monitoring Manual; HMMC-13304: Technical Manual Scheme B; HMMC-13872: Electrical Load Balance; HMST-3104: Costa Mediterranea - Scrubber project - New DD/BB and over board in incinerator room; HMST- 3106: Costa Mediterranea - Scrubber project - New DD/BB and over board in incinerator room; HMST- 3227: Costa Mediterranea - Scrubber project - Collecting water DB (CWDB1) and BW3P structural modifiation; HMST-3228: Costa Mediterranea - Scrubber project - Sea chest modification.
ECG System ECO-DeSOx consisting of the verified components listed in "EGCS Technical Manual - Scheme B" approved with RINA No. HMMC-13302.
|
Limitation on the acceptance or use of the
product
In scheme B, according to MEPC.259(68), compliance with emission requirements is demonstrated by continuous exhaust gas monitoring.
EGCS acceptance and use to be within the terms and conditions of “Procedure for Compliance” at Para. 6 of HMMC-13302 approved on 08 April 2019: “SOx Emissions Compliance Plan”.
Monitoring system is subject to periodic surveys by RINA according to MEPC.259(68).
____________________________ |
|
|
General condition of approval
a) This certificate will not be valid if the manufacturer or user makes any modification to the equipment, which has not been notified to, and agreed with RINA |
|
|
|