|
 |
ATTACHMENT TO
|
CERTIFICATE No. MED158620VE/003
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Verified components of the equipment (with serial
number) |
|
|
|
17-057-MAR-SC-500 (INTENDED FOR DG#5 COSTA FIRENZE) |
|
|
|
|
|
|
|
| Technical documentation |
|
|
|
HMMC-18074 approved on 24 Nov 2020 - Costa Firenze EGC System Technical Manual – Scheme B, Revision: 23 October 2020 HMMC-16715 approved on 17 Apr 2020 - Costa Firenze EGC System Onboard Monitoring Manual, Revision: 24 March 2020 HMMC-16716 approved on 17 Apr 2020 - Costa Firenze SOx Emission Compliance Plan, Revision: 24 March 2020 PRMT-15056 approved on 02 Sep 2017 - EGC Record book, Revision: 09 August 2017 HMMC-17925 approved on 09 Oct 2020 - Exhaust Gas PID - Exhaust gas ducts functional diagram PPVT-31318 approved on 06 May 2019 - Scrubber water system
ECG System ECO-DeSOx consisting of the verified components listed in "EGCS Technical Manual - Scheme B" approved with RINA No. HMMC-18074
|
Limitation on the acceptance or use of the
product
In scheme B, according to MEPC.259(68), compliance with emission requirements is demonstrated by continuous exhaust gas monitoring.
EGCS acceptance and use to be within the terms and conditions of “Procedure for Compliance” at Para.
6 of HMMC-16716 approved on 17 April 2020 : “SOx Emissions Compliance Plan” .
Monitoring system is subject to periodic surveys by RINA according to MEPC.259(68).
____________________________ |
|
|
General condition of approval
a) This certificate will not be valid if the manufacturer or user makes any modification to the equipment, which has not been notified to, and agreed with RINA |
|
|
|