ENGGN01/01/2026
 
Scheda
 Marine Equipment
Verifica della produzione mediante controllo dei prodotti
Module: G
Certification N. MED721425WS
Certificate date 1/1/26
Type Prevenzione dell'inquinamento marino
Directive (EU) 2025/1533
Product Sistemi di trattamento dei gas di scarico a bordo
Item Nº MED/2.10
Model MPUSOx/U-4900 open loop
Identification OSU2420-010-4931 intended for main engine( 1 set) + auxiliary engines(3 sets); Ship name:M/V YIANGOS(IMO:9414931)
Applicant CHINA ZHEJIANG ENERGY MARINE ENVIRONMENTAL TECHNOLOGY CO., LTD.
Place of requester 601,Building3 NO.371,Mingxing Road, Economical and Technological Development Zone, Xiaoshan Area, Ha Hangzhou (Zhejiang)  % CHINA
Tel. N.,Fax, Email 0571-86605111, ---, liuyifan@zeme-china.com
Standards IMO Res. MEPC.340(77)
Surveyor Qiangfu Tan
Responsible Office RINA China Marine



UNIT VERIFICATION CONFORMITY (MODULE G)
CERTIFICATE No.  MED721425WS

This is to certify
that RINA Services S.p.A. did undertake the relevant conformity assessment procedures for the equipment of the manufacturer identified below, which was found to be in compliance with the Marine-Pollution prevention requirements of Marine Equipment Directive (MED) 2014/90/EU, including the requirements and testing standards of (EU) 2025/1533.
MED Item Nº MED/2.10
Description On board exhaust gas cleaning systems
Type MPUSOx/U-4900 open loop
Identification OSU2420-010-4931 intended for main engine( 1 set) + auxiliary engines(3 sets); Ship name:M/V YIANGOS(IMO:9414931)
Applicant CHINA ZHEJIANG ENERGY MARINE ENVIRONMENTAL TECHNOLOGY CO., LTD.
601,Building3 NO.371,Mingxing Road, Economical and Technological Development Zone, Xiaoshan Area, Ha Hangzhou (Zhejiang)
CHINA
Testing standards IMO Res. MEPC.340(77)
    
Issued in Genoa 
on January 1, 2026

This Certificate consists of this sheet plus an attachment
This certificate authorises the Manufacturer or his authorised representative established within the Community to affix the following symbol on the equipment above identified.
0474 /26
 

________________________________________
RINA Services S.p.A. - Yongjun Pan
RINA Services S.p.A.
**** NOTICE: This is NOT an official certificate ****
ATTACHMENT TO
CERTIFICATE No. MED721425WS
Place of unit verification
ON BOARD OF M/V YIANGOS(IMO:9414931),,

Verified components of the equipment (with serial number)
OSU2420-010-4931 intended for main engine( 1 set) + auxiliary engines(3 sets); Ship name:M/V YIANGOS(IMO:9414931)
Technical documentation
1, Following statutory document have been approved/filed in compliance with IMO Res. MEPC.176(58) - (Revised MARPOL Annex VI, Reg.4) and IMO Res. MEPC.340(77):
 1.1 SOx EMISSION COMPLIANCE PLAN (SECP)-R0;
 1.2 ECG RECORD BOOK -R0;
 1.3 EGC SYSTEM TECHNICAL MANUAL(ETM-B) - R0;
 1.4 EGC ON BOARD MONITORING MANUAL (OMM)-R0;
 1.5 Technical Specification;
 1.6 Electrical Drawing;
 1.7 General arrangement of Scrubber;
 1.8 P&ID drawing;
 1.9 P&ID_Binder
 1.10 MARPOL approval test Scheme B;
 1.11 PH Discharge.

2. Product description:
The EGC unit from Zhejiang Energy Marine Environmental Technology Co.,Ltd, often referred to as a scrubber, is based on the wet scrubbing technology. This particular system uses the surrounding sea water as wash water, which is discharged once through, that it is described as an open system.The entire monitoring system is designed according to MARPOL Annex VI, NOx technical code 2008 chapter 5 and its Appendix III and according to Section 6 of the Guidelines. A continuous stream of exhaust gas is Extracted from the funnel after the EGC unit. The sample probe draws in the sample stream which is led to the conditioning cabinet via a heated Sample line, where it is filtered and dehumidified before it is sent to the gas analyzer. The analyzer measures the SO2 and CO2 from where the Emission Ratio (ER) can be calculated. The measurements are logged every 90 seconds (the required interval is every 4.75minutes)

3. Completed Tests on board were carried out on 21/11/2025 during sea trial in accordance with IMO Res. MEPC.340(77) & approved documents, and relevant testing reports/ records are listed as below:
3.1. Commissioning test report;
3.2. Bunker Delivery Notes and laboratory analysis report;
3.3. Type approval certificate for Emission Monitoring system (By ABS)
3.4.  Scrubber control panel test report .
3.5. Calibration protocols/certificates of CEMS and water monitoring sensors;
3.6. Span gas analysis certificate;
3.7. The body of Exhaust Gas Cleaning System test report ;
3.8. Electric Motors and Feed pumps test report ;
3.9. Wash water sample nitrate analyses report from laboratory, and
Certification for laboratory.

Limitation on the acceptance or use of the product
Max. Exhaust Mass Flow Rate is 224744 kg/h.
____________________________
General condition of approval
a) This certificate will not be valid if the manufacturer or user makes any modification to the equipment, which has not been notified to, and agreed with RINA

___________________________________
RINA Services S.p.A. - Yongjun Pan
RINA Services S.p.A.
**** NOTICE: This is NOT an official certificate ****