MED251122XG!003ENGD- -  -  S- MPACT® Tuck-In Pipe Transit -S- S- S- -30/09/2022- Marine Equipment- - SN- S- - N-  - 1,050,770B2bisMarine EquipmentNumero Pratica,Direttiva,Norma,Schema,Richiesta,Validità- MED251122XG/003- N-Sep 29, 20271050770
 
Form
  Marine Equipment(TO)
Certification N. MED251122XG/003 - (ENG)
Certificate date 30/09/2022
Type Protezione antincendio
Product Penetrations through "A" Class divisions: (b) pipe, duct, trunk, etc. penetrations
Item Nº MED/3.26b
USCG Category N° 164.138

Model or Denomin.
Items
MPACT® Tuck-In Pipe Transit
Manufacturer STI Marine Firestop, a division of Specified Technologies Inc.  
Cross reference:  STI Marine Firestop, a division of Specified Technologies Inc.
Tel. N.,Fax, Email +19085268000, ---, jlopes@stimarine.com
Place of production 210 Evans Way  %  08876 Somerville (New Jersey)  % U.S.A.
Tel. N.,Fax, Email +19085268000, ---, jlopes@stimarine.com
Applicant STI Marine Firestop, a division of Specified Technologies Inc.
Place of requester 210 Evans Way  %  08876 Somerville (New Jersey)  % U.S.A.
Tel. N.,Fax, Email +19085268000, ---, jlopes@stimarine.com
Directive (EU) 2022/1157
Standards IMO Res. MSC.307(88)-(2010 FTP Code) - IMO MSC.1/Circ. 1488
Reference Documents Chap. II-2 of SOLAS 74 Convention, as amended, RINA Rules for the certification of Marine Equipment
Request 18/12/2017
Expire date 29/09/2027
Head Office Hamburg
EC TYPE-EXAMINATION (MODULE B) ENG
Vuoto Querysave
Giuseppe Russo S

EC TYPE EXAMINATION (MODULE B)
CERTIFICATE No. MED251122XG/003

This is to certify that RINA Services S.p.A. (Notified Body No. 0474) did undertake the relevant type approval procedures for the equipment identified below, which was found to be in compliance with the Fire Protection requirements of Marine Equipment Directive (MED) 2014/90/EU, including the requirements and testing standards of Regulation (EU) 2022/1157.
MED Item Nº MED/3.26b
USCG Category Nº 164.138
Description Penetrations through "A" Class divisions: (b) pipe, duct, trunk, etc. penetrations
Type MPACT® Tuck-In Pipe Transit
Applicant STI Marine Firestop, a division of Specified Technologies Inc.
210 Evans Way,08876 Somerville (New Jersey),U.S.A.

Testing standards IMO Res. MSC.307(88)-(2010 FTP Code) - IMO MSC.1/Circ. 1488
Reference standards Chap. II-2 of SOLAS 74 Convention, as amended, RINA Rules for the certification of Marine Equipment
Issued in Hamburg on
This Certificate is valid until
September 30, 2022
September 29, 2027
This Certificate consists of this sheet plus an attachment

________________________________________
Giuseppe Russo
RINA Services S.p.A.
**** NOTICE: This is NOT an official certificate ****

ATTACHMENT TO
CERTIFICATE No.  MED251122XG/003
Page 1 of 4
Manufacturer
STI Marine Firestop, a division of Specified Technologies Inc.
Place of Manufacturer
210 Evans Way,08876 Somerville (New Jersey),U.S.A.

Product Description


STIM0161 MPACT Double Wrap Strip Layer Configuration (Max. 169mm OD Plastic Pipe):
1) Min. 3mm thick by min. 127mm long mild steel sleeve welded to the deck/bulkhead plating. Two layers of MWS250 Marine Wrap Strip (min. 51mm wide by nom. 6.4mm thick) wrapped around the pipe on both sides of the sleeve, recessed min. 12.7mm to accommodate sealant. Min. 12.7mm thickness of MFS Marine Firestop Sealant (or MSL Marine Silicone Sealant for CPVC pipes) applied on both sides of sleeve, flush with sleeve ends. Transit sleeve insulated with A-60 approved insulation. See STI Drawing No. STIM0161, dated 07/22/22, for tables describing approved pipe types/sizes, sleeve diameters, and insulation requirements.

STIM0177 MPACT Single Wrap Strip Layer Configurations (Max. 63mm OD Plastic Pipe):
1) Min. 3mm thick by min. 127mm long mild steel sleeve welded to the deck/bulkhead plating. One layer of MWS250 Marine Wrap Strip (min. 51mm wide by nom. 6.4mm thick) or MWS251 Marine Wrap Strip (min. 51mm wide by nom. 4.8mm thick) wrapped around the pipe on both sides of the sleeve, recessed min. 12.7mm to accommodate sealant. Min. 12.7mm thickness of MFS Marine Firestop Sealant (or MSL Marine Silicone Sealant for CPVC pipes) applied on both sides of sleeve, flush with sleeve ends. Transit sleeve insulated with A-60 approved insulation. See STI Drawing No. STIM0177, dated 10/11/22, for tables describing approved pipe types/sizes, sleeve diameters, wrap strip types, and insulation requirements.
2) Min. 3mm thick by min. 150mm long mild steel sleeve welded to the bulkhead plating. One layer of MWS250 Marine Wrap Strip (min. 51mm wide by nom. 6.4mm thick) wrapped around the pipe on both sides of the sleeve, recessed min. 12.7mm to accommodate sealant. Min. 12.7mm thickness of MFS Marine Firestop Sealant (or MSL Marine Silicone Sealant for CPVC pipes) applied on both sides of sleeve, flush with sleeve ends. Transit sleeve insulated with A-60 approved insulation. See STI Drawing No. STIM0177, dated 10/11/22, for tables describing approved pipe types/sizes, sleeve diameters, and insulation requirements.

Installations as per manufacturer instruction.






Attachment to Certificate No. MED251122XG/003 Page 2 of 5

Field of Application

The transit is approved for use in A-0 – A-60 watertight or non-watertight steel bulkheads and decks and is intended for single plastic pipe penetrations. Approved plastic pipe types include ABS, PVC, uPVC, CPVC, PB, PE, PP, and PPr.

The transits are to be insulated (in addition to the approved insulation arrangements for the division) as detailed in the following tables:
- STIM0161 MPACT Wrap Strip Tuck-In Pipe Transit:





Notes:
1) In bulkheads only, insulation block to extend 100mm around the sleeve for PE and CPVC pipes.
2) The distance between the pipe and steel sleeve is min 13mm to max 61mm.
3) Listed diameters may differ from available pipe sizes.
4) For CPVC pipes only, MSL Marine Silicone Sealant is applied over the wrap strip. MFS Marine Firestop Sealant to be applied over wrap strip for all other pipe types.





Attachment to Certificate No. MED251122XG/003 Page 3 of 5


- STIM0177 MPACT Wrap Strip Tuck-In Pipe Transit:





Notes:
1) In bulkheads only for sleeve 127 mm long, insulation block to extend 100mm around the sleeve for PE and CPVC pipes.
2) The distance between the pipe and steel sleeve is min 13mm to max 61mm.
3) Listed diameters may differ from available pipe sizes.
4) For CPVC pipes only, MSL Marine Silicone Sealant is applied over the wrap strip. MFS Marine Firestop Sealant to be applied over wrap strip for all other pipe types.







Attachment to Certificate No. MED251122XG/003 Page 4 of 5


Reference Documents and Tests Carried Out

STI Drawing No. STIM0161 (RINA Doc. No. HMFP-8384, dated July 7, 2022) and No. STIM0177 (RINA Doc. No. HMFP-8385, dated October 11, 2022) – Plastic Pipes, A-0 – A-60 steel bulkhead or deck.
Testing References filed with RINA Doc. No. HMFP-8386.
Test Reports filed with RINA Doc. Nos. HMFP-6601, HMFP-6602, HMFP-6603, HMFP-6604 and HMFP-6605, HMFP-8379-8380-8381, HMFP 8382-8383.

The watertightness tests have been carried out witnessed by other IACS Society.

Remarks

1. The penetration is also recognized for gastightness and watertightness for the following:
- Pressure limited to maximum Ø219 mm sleeves
- Gastightness up to 1 bar for 30 minutes with no leakage
- Watertightness up to 2 bar for 60 minutes with no leakage
2. All penetrations are to be insulated to same fire class as bulkhead and deck. Other applications are subject to case-by-case approval. The insulation materials are to be approved.

3. In A-0, A-15 and A-30 divisions, the transit is to be insulated per the A-60 design on the penetration itself and for 200 mm around.

4. Production items are to be manufactured in accordance with a quality control system which shall be maintained to ensure that items are of the same standard as the approved prototype.

5. These types of penetrations are not suitable for tank boundaries and where the penetrations are subject to frequent immersion in fluids. Such scope is to be considered on case-by-case basis.

6. The validity of this Certificate ceases in the case of amendments to the rules on the basis of which the Certificate was issued.




ATTACHMENT TO
CERTIFICATE No. MED251122XG/003
Pages 4 of 4

Acceptance conditions

This Application is not suitable on divisions where watertightness properties are requested.
· The validity of the present certificate is based on the assumption of the constant conformity of the single product manufactured to the prototype that has been tested with positive results to the type approval tests. The firm is responsible in the whole of the above mentioned conformity.
· The holder of the type approval certificate has to inform RINA of any intended modifications to the product and/or manufacturing process which are liable to effect the required conformity of the product.
· The certificate becomes automatically invalid in the following case:
1. the holder of the certificate does not respect the above mentioned obligations.
2. changes have been made to the reference document on which the type approval is based.
· The type approval certificate may be declared suspended or cancelled by RINA when the conditions on which the type approval was based are not fulfilled:
The mark of conformity may only be affixed to the above type approved equipment and a Manufacturer's Declaration of Conformity issued when the production control phase module (D, E or F) of Annex II of the Directive is fully complied with a written inspection agreement with a Notified Body
XXXX/YY
"WHEELMARK FORMAT"

XXXX
Notified Body number undertaking surveillance module
YY
Last two digits of year mark affixed
     
______________________________________________
General conditions for the approval
a) The initial conditions verified by RINA at the time of the approval are to be maintained
b) Any changes to the initial conditions are to be promptly communicated to RINA, which reserves the right to repeat the relevant assessment
c) This certificate will no be valid if the manufacturer makes any changes or modifications to the approved equipment, which have not been notified to, and agreed with RINA
d) RINA personnel are to be allowed to witness during the performances of activities, upon their request
e) The activities are to be carried out in compliance with the RINA Rules and/or other applicable Rules

f) Should the specified regulations or standards be amended during the validity of this certificate, the product is to be reapproved prior to it being placed on board vessels to which the amended regulations or standards apply. 


__________________________________________
Giuseppe Russo
**** NOTICE: This is NOT an official certificate ****