ENGGN01/06/2022
 
Scheda
 Marine Equipment
Verifica della produzione mediante controllo dei prodotti
Module: G
Certification N. MED136722WS
Certificate date 6/1/22
Type Prevenzione dell'inquinamento marino
Directive (EU) 2021/1158
Product Sistemi di trattamento dei gas di scarico a bordo
Item Nº MED/2.10
Model Open Loop U-type Scrubber
Identification C563C- 100SC1/C563C - 100SC2,
for  2 sets Main engine of Ship name: FINNECO III(IMO 9856854, RI 97933)
Applicant Langh Tech Oy Ab
Place of requester Alaskartano, Vanhamakarlantie 29  %  21500 Piikkio  % FINLAND
Tel. N.,Fax, Email +358 2 4779400, ---, sanna.rimpelainen@langh.fi
Standards IMO Res. MEPC.259(68)
Specified IMO Res. MEPC.176(58) - (Revised MARPOL Annex VI, Reg.4) and  IMO Res. MEPC.259(68)
Surveyor QI Zhengchao
Responsible Office RINA China Marine



UNIT VERIFICATION CONFORMITY (MODULE G)
CERTIFICATE No.  MED136722WS

This is to certify
that RINA Services S.p.A. did undertake the relevant conformity assessment procedures for the equipment of the manufacturer identified below, which was found to be in compliance with the Marine-Pollution prevention requirements of Marine Equipment Directive (MED) 2014/90/EU, including the requirements and testing standards of (EU) 2021/1158.
MED Item Nº MED/2.10
Description On board exhaust gas cleaning systems
Type Open Loop U-type Scrubber
Identification C563C- 100SC1/C563C - 100SC2,
for  2 sets Main engine of Ship name: FINNECO III(IMO 9856854, RI 97933)
Applicant Langh Tech Oy Ab
Alaskartano, Vanhamakarlantie 29
21500 Piikkio
FINLAND
Testing standards IMO Res. MEPC.259(68)
Reference standards IMO Res. MEPC.176(58) - (Revised MARPOL Annex VI, Reg.4) and  IMO Res. MEPC.259(68)
    
Issued in RINA China Marine 
on June 1, 2022

This Certificate consists of this sheet plus an attachment
This certificate authorises the Manufacturer or his authorised representative established within the Community to affix the following symbol on the equipment above identified.
0474 /22
 

________________________________________
RINA Services S.p.A. - Hong Gu
RINA Services S.p.A.
**** NOTICE: This is NOT an official certificate ****
ATTACHMENT TO
CERTIFICATE No. MED136722WS

Verified components of the equipment (with serial number)
C563C- 100SC1/C563C - 100SC2,
for  2 sets Main engine of Ship name: FINNECO III(IMO 9856854, RI 97933)
Technical documentation
1, Following statutory document have been approved/filed in compliance with IMO Res. MEPC.176(58) - (Revised MARPOL Annex VI, Reg.4) and  IMO Res. MEPC.259(68):
1.1 Technical Specification, PLMC/1517;     
1.2 Onboard Monitoring Manual (OMM), PLMC/4218;
1.3 Technical Manual, Scheme B (ETM-B), PLMC/2092 ;
1.4 SOx Emission Compliance Plan, Scheme B (SECP), PLMC/2096;
1.5 EGC Record Book, PLMC/4100;
1.6 Scrubber system - ship automation signal exchange; Project name C563, PLMC/1523;
1.7 Tower Drawing, PLMC/1514
1.8 Principle diagram of scrubber system, SHMC/19107;
1.9 Scrubber system alarm list, PLMC/2088;
1.10 Electrical system of Scrubber, SHEL/9429
1.11 Arrangement of high&low, scrubber sea chest in ER  PLMC/18216

2. Product description:
The EGC unit from Langh Tech, often referred to as a scrubber, is based on the wet scrubbing technology. This particular system uses the surrounding seawater as wash water, which is discharged once through, that it is described as an open system.
The entire monitoring system is designed according to MARPOL Annex VI, NOx technical code 2008 chapter 5 and its Appendix III and according to section 6 of the Guidelines. A continuous stream of exhaust gas is extracted from the funnel after the EGC unit. The sample probe draws in the sample stream which is led to the conditioning cabinet via a heated sample line, where it is filtered and dehu-midified before it is sent to the gas analyser. The analyser measures the SO2 and CO2 from where the Emission Ratio (ER) can be calculated. The measurements are logged every 4 minutes (the required interval is every 4.75 minutes)

3.Completed Tests on board were carried out and witnessed by RINA surveyor from 12/05/2022 to 14/05/2022 in accordance with IMO Res. MEPC.259(68) & approved documents, and relevant testing reports/ records are listed as below:
1. Commissioning test report;
2. EGC history data recording report during sea trial tests
3. Bunker Delivery Notes;
4. FAT report for scrubber control panel.
5. Calibration protocols/certificates of CEMS and water monitoring sensors;
6. Span gas certificates;
7. RINA Certificate for the body of Exhaust Gas Cleaning System;
8. DNV-GL Certificate for Electric Motors and Feed pumps;
9. Wash water sample nitrate analyses report from laboratory, and Certification for laboratory.

Limitation on the acceptance or use of the product
Max. Exhaust Mass Flow Rate is 94320 kg/h
____________________________
General condition of approval
a) This certificate will not be valid if the manufacturer or user makes any modification to the equipment, which has not been notified to, and agreed with RINA

___________________________________
RINA Services S.p.A. - Hong Gu
RINA Services S.p.A.
**** NOTICE: This is NOT an official certificate ****