The HiMSEN engine control system HiMECS-AE is designed for control and monitoring variant
type of engine that is classified in DF-GA (Gaseous fuel Admission), DF-LI (Liquid fuel Injection)
and Diesel (FA: Fuel Actuator / EFI: Electronic Fuel Injection).
All hardware configuration of HiMECS-AE consists of LOP (Local Operating Panel), IOS_M (IO
Station Main), IOS_N (IO Station N), ICM (Injection Control Module), CMM (Cylinder Monitoring
Module) and ACP (Auxiliary Control Panel). It is configured with the following specifications.
Local Operating Panel
- Major Component : Main Control Unit
- Manufacturer : AVAT Automation GmbH
- Operating Temperature : 0 C.deg~ 55 C.deg
- Rated Voltage : 24Vdc
- IP degree : IP44
IO Station Main, IO Station N, Auxiliary Control Panel
- Major Component : Communication unit, IO module
- Manufacturer: AVAT Automation GmbH
- Operating Temperature : 0 C.deg~ 55 C.deg
- Rated Voltage : 24Vdc
- IP degree : IP44
Injection Control Module
- Type : LECM 8280-4005, LECM 8280-4060
- Manufacturer : Woodward
- Rated Voltage : 24Vdc
- IP degree : IP69K
Cylinder Monitoring Module
- Type : E2Precon-B10
- Manufacturer: AVAT Automation GmbH
- Operating Temperature : 5 C.deg~ 75 C.deg
- Rated Voltage : 24Vdc
- IP degree : IP65
Ethernet Switch
- Type : FL switch 2208
- Manufacturer : Phoenix contact
- Operating Temperature : 0 C.deg~ 55 C.deg
- Rated Voltage : 24Vdc
- IP degree : IP20
TYPE APPROVAL CERTIFICATE
No. ELE048326PU
Enclosure - Page 2 of 2
HiMSEN 4-stroke Engine Control System
Software Number
- Main Control Unit : 2.x.x
- Engine safety unit : 1.x.x
- IO Unit : 1.x.x
- Display Unit : 1.x.x
- ICM : 5418-8001.xx
- CCM : HHP31x
Reference Documents
- ENV & EMC Test: KOMERI’s test report No. KOMERI-0311-25T0780(E) dated 12 Jan 2026, No. KOMERI-0314-25T0772(E) dated 24 Dec 2025, KOMERI-0602-25T0776(E) dated 22 Dec 2025, No. KOMERI-0314-25T2112(E) dated 24 Dec 2025, No. KOMERI-0314-25T0784(E) dated 24 Dec 2025
- HiMECS-AE Approval Document no.1~10
- Manual : HiMECS-AE Operation Description Rev.1 dated Fed 2026
- FMEA : Failure Mode Effect Analysis HiMECS-AE Rev.1 dated 10 Sep 2025
- Visual Inspection & Performance TEST : Programme of Type Approval Test dated 23 Apr 2026 attended by RINA Surveyor
- The above documents and reports are archived in LD+ as "PUEL-14708~14723","PUEL-14808~14811".
Note/Remark
- The product is always subject to the compliance with RINA Rules and other Standards mentioned on certificate
- Type Approval certifies that a representative sample of the product has been found to meet the applicable design criteria
- Any modification or change shall not be valid until approval is granted by RINA as a result of due assessment