1, Following statutory document have been approved/filed in compliance with IMO Res. MEPC.340(77): 1.1 Onboard Monitoring Manual (OMM), SHMC/22671; 1.2 Technical Manual, Scheme B (ETM-B), SHMC/22649 ; 1.3 SOx Emission Compliance Plan, Scheme B (SECP), SHMC/22731; 1.4 EGC Record Book, SHMC/22653; 1.5 Electrical Wiring Diagram, SHEL/13495; 1.6 Piping and Instruments Diagram, SHMC/21651 1.7 Alarm Point List, SHEL/13424 1.8 Scrubber Discharge Water PH Value CFS Report, SHMC/21844
2. Product description: -The EGC unit from Jiangsu Zhenhua Environmental Protection Technology Co., Ltd, referred to as a scrubber, is based on the wet scrubbing technology. This particular system uses the surrounding seawater as wash water, which is discharged once through, that it is described as an open system. -The entire monitoring system is designed according to MARPOL Annex VI, and IMO Resolution MEPC.340(77). A continuous stream of exhaust gas is extracted from the funnel after the EGC unit. The sample probe draws in the sample stream which is led to the conditioning cabinet via a heated sample line, where it is filtered and dehumidified before it is sent to the gas analysor. The analysor measures the SO2 and CO2 from where the Emission Ratio (ER) can be calculated. The measurements are logged every 4.76 seconds (the required interval is every 285 second).
3.Completed Tests on board were carried out and witnessed by RINA surveyor from 18/11/2022 to 20/11/2022 in accordance with IMO Res. MEPC.340(77) & approved documents, and relevant testing reports/ records are listed as below: 1. Sea trial procedure and EGCS test record; 2. Bunker Delivery Notes; 3. Rina certificate for Air Receiver; 4. FAT report for Electrical Control System. 5. Manufacturer Certificate for EGCS Tower Body 6. Rina Certificate for Sea Water Pump including Motor. 7. Type Approve certificate of CEMS issued by BV; 8. Type Approve certificate of WMS issued by BV; 9. FAT report for Centrifugal Air Fans; 10.Wash water sample nitrate analyses report from laboratory.
|