ENGBNMar 12, 2027
 
Scheda
 Marine Equipment
Verifica della produzione mediante controllo di qualità
Module: B
Mezzi di salvataggio
Applicant VELERIA SAN GIORGIO S.R.L.
Place of requester VIA A DE GASPERI 37H  %  16030 Casarza Ligure (GE)  % ITALY
Tel. N.,Fax, Email 0185 467701, 0185 467050, info@veleriasangiorgio.com
Directive (EU) 2024/1975
Dati Certificato D o E
Certification N. MED117725GE
Certificate date 09/06/2025
   

Giovanni Carratino S


PRODUCTION QUALITY ASSURANCE (MODULE D)
CERTIFICATE No.  MED117725GE

This is to certify that
RINA Services S.p.A. did undertake the relevant assessment procedures for the quality system of the manufacturer identified below, which was found to be in compliance with the Life-Saving appliances requirements of Marine Equipment Directive (MED) 2014/90/EU, including the requirements and testing standards of (EU) 2024/1975, for the products described in the EC Type Examination Certificates (Module B) listed in the Attachment to this Certificate.
Type
Applicant VELERIA SAN GIORGIO S.R.L.
VIA A DE GASPERI 37H,16030 Casarza Ligure (GE),ITALY
  
   
   
    
Issued in RINA Genoa Marine on
This Certificate is valid until
June 9, 2025
March 12, 2027

This Certificate consists of this sheet plus an attachment
This certificate, in conjunction with the EC TYPE EXAMINATION (MODULE B) CERTIFICATE of the equipment listed in the Attachment, authorises the Manufacturer or his authorised representative established within the Community to affix the "Mark of Conformity" (wheelmark) as reported below.
0474 /YY
YY Last two digits of year mark affixed

________________________________________
Giovanni Carratino
RINA Services S.p.A.
**** NOTICE: This is NOT an official certificate ****

ATTACHMENT TO
CERTIFICATE No. MED117725GE
Equipment:
Technical documentation
SITE B: SHANGHAI BINXUN INDUSTRIAL Co. Ltd. 5 FLOOR - 2 BUILDING N.5025 DONGCHUAN GONG ROAD - SHANGHAI - CHINA

____________________________________
General conditions for the approval
a) The initial conditions verified by RINA at the time of the approval are to be maintained
b) Any changes to the initial conditions are to be promptly communicated to RINA, which reserves the right to repeat the relevant assessment
c) RINA personnel are to be allowed to witness during the performances of activities, upon their request
d) The activities are to be carried out in compliance with the RINA Rules and/or other applicable Rules
e) RINA may revoke the approval in the case of modifications to requirements or conditions for the approval
f) Should the specified regulations or standards be amended during the validity of this certificate, the product is to be reapproved prior to it being placed on board vessels to which the amended regulations or standards apply.
g) This certificate loses its validity in case the EC type Examination (Module B) certificate is no more valid.
__________________________________
Giovanni Carratino

**** NOTICE: This is NOT an official certificate ****