1, Following statutory document have been approved/filed in compliance with IMO Res. MEPC.176(58) - (Revised MARPOL Annex VI, Reg.4) and IMO Res. MEPC.259(68): 1.1,- EGC-SOx TECHNICAL MANUAL: SHMC-16821; 1.2,- ONBOARD MONITORING MANUAL: SHMC-16822; 1.3,- SOx EMSSIONS COMPLIANCE PLAN: SHMC-16823; 1.4,- EGC RECORD BOOK FORM: SHMC-16824; 1.5,- PIPING & INSTRUMENTS DIAGRAM: SHMC-15229; 1.6,- ELECTRIC LOAD CALCULATION: SHEL-8504; 1.7,- MAIN COOLING SEA WATER SYSTEM: SHMC-15148. 1.8,- CONTROL AIR SYSTEM: SHMC-15150; 1.9,- HOT W. DRAINK. W & GENERAL SERVICE FRESH WATER PIPING:SHMC-15151; 1.10,- ZEPT-VALVES APPROVAL DRAWING: SHMC-15355; 1.11, - CALCULATION OF SEA WATER FLOODING IN ER: SHMC-15561; 1.12,- FUNNEL CONSTRUCTION MODIFICATION: SHST-35121; 1.13,- FOUNDATION OF SCRUBBER: SHST-35221; 1.14,- ENGINE ROOM CONSTRUCTION(TRANS SECTION): SHST-35223; 1.15,- PIPING DIAGRAM FOR REMOTE CONTROL VALVE: SHMC-15230.
2. Product description: The EGC plant of ZEPT-DeSOx-U-300-H is designed and manufactured by Jiangsu Zhenhua Environmental Protection Technology Co., Ltd . The serial number of this production for “ MSC APOLLO” (IMO: 9247730) is ZEPT-P-19007-3. EGC plant of ZEPT-DeSOx-U-300-H is U type and hybrid mode consist of Scrubber unit, spray system, washwater system, washwater treatment unit, NaOH system, steam heating, control air system, demister system, and electric control and monitoring system. The ZEPT-DeSOx-U-300-H of U type system is a hybrid system based on seawater and the mixed solution consisting of the seawater and NaOH. The system is designed based on the maximum fuel oil sulphur content is 3.5%(m/m). The SO2 (ppm)/CO2(%) ratio values in the exhaust gas is less than 4.3, it is equivalent to the fuel oil with sulphur content 0.1%(m/m) after scrubbing by EGC system with cleaning efficiency 97.15%. The emissions comply with regulations 14.1 and/or 14.4 of MARPOL Annex VI. Max. exhaust gas flow is 242,514 kg/h and Min. exhaust gas flow has no specific Requirements. Washwater residue was monitored by Resolution MEPC.259 (68). The pH discharge limit shall be determined by CFD instead of direct measurement at 4m from the overboard discharge point in accordance with 10.1.2.1 of MEPC. 259(68). The CFD report is attached at the end of this manual. According to the CFD report, when the minimum pH value measured at the discharge pipe is 3.42, the calculated pH value of wash water at 4m from the overboard discharge point is around 6.7, which could comply with the discharge regulation successfully. Open loop mode Spray water of all wash layers Spray water of pre-cooling layer Flow Design 2,188 m³ /h Design 60 m³ /h Pressure Min. 1 bar Min. 1 bar Max. 2.5 bar Max. 2.5 bar Closed loop Mode Flow Design 1,023 m³ /h Design 60 m³ /h Pressure Min. 1 bar Min. 1 bar Max. 2.5 bar Max. 2.5 bar NaOH Concentration 50 % Consumption (Utilization 90%) 0.62 m³ /h Sea Water PH ≥8.0 Sea Water Alkalinity ≥2,000 μmol/liter. The design of washwater quantity for ZEPT-DeSOx-U-300-H is 2,248 m³/h for open loop mode, it is equivalent to 53.96 t/MW∙h and to be measured by fluorescence for the PAH value. And the compliance requirements is not greater than 41.7 μg/L above the inlet of sea water to meet the 10.1.3.3 of MEPC.259(68). The design of washwater quantity for ZEPT-DeSOx-U-300-H is 1,083 m³/h for closed loop mode, it is equivalent to 27.89 t/MW∙h and to be measured by fluorescence for the PAH value. And the compliance requirements is not greater than 80.7μg/L above the inlet of sea water to meet the 10.1.3.3 of MEPC.259(68). The maximum continuous turbidity in washwater should not be greater than 25 FNU or 25 NTU or equivalent units, above the inlet water turbidity. However, during periods of high inlet turbidity, the precision of the measurement device and the time lapse between inlet measurement and outlet measurement are such that the use of a difference limit is unreliable. Therefore all turbidity difference readings should be a rolling average over a 15-minute period to a maximum of 25 FNU. For the purposes of this criteria the turbidity in the washwater should be measured downstream of the water treatment equipment but upstream of washwater dilution (or other reactant dosing) prior to discharge. The washwater treatment system should prevent the discharge of nitrates beyond that associated with a 12% removal of NOX from the exhaust, or beyond 60 mg/l normalized for washwater discharge rate of 45 t/MWh whichever is greater.
3. The EGCS installation inspection and testing on board ship have been witnessed by RINA surveyor from 05/06/2020 to 07/09/2020 in accordance with IMO Res. MEPC.259(68) & approved documents. The following testing reports/ records are satisfactorily reviewed and attached: 3.1. Sea trial report and BDN; 3.2. Shipyard inspection report; 3.3. Calibration protocols/certificates of CEMS and water monitoring sensors; 3.4. Span gas certificates; 3.5. Testing certificate for scrubber; 3.6. PH analyzer certificate; 3.7. Wash water sample nitrate analyses report from laboratory;
|