|
 |
ATTACHMENT TO
|
CERTIFICATE No. MED223122XG/002
|
|
|
|
|
|
|
|
|
|
|
|
|
| Place of unit verification |
|
|
|
| Civitavecchia, Italy,, |
|
|
|
Verified components of the equipment (with serial
number) |
|
|
|
18-399-MAR- SC-600 intended for COSTA FORTUNA DG6 Scrubber |
|
|
|
|
|
|
|
| Technical documentation |
|
|
|
HMFP-8396 approved on 12 October 2022 - Exhaust Gas Cleaning System - Technical Manual - Scheme B HMFP-8397 approved on 12 October 2022 - Exhaust Gas Cleaning System - Onboard Monitoring Manual HMFP-8398 approved on 12 October 2022 - Exhaust Gas Cleaning System - SOx Emissions Compliance Plan PRMT-15056 approved on 02 September 2017 - Exhaust Gas Cleaning System - Record Book - Scheme B HMMC-22384 approved on 14 October 2022 - DESOX and Filtration System - Piping Diagram
EGCS System ECO-DeSOx consisting of the verified components listed in "Exhaust Gas Cleaning System - Technical manual - Scheme B" approved with RINA No. HMFP8396. ------------------------------------------------- Tests Carried Out: RINA test job Carried out as per reported in Leo. 412, Job File No. RS/2022/RM/01/30
|
Limitation on the acceptance or use of the
product
In Scheme B, According to MEPC 259(68) compliance with emission requirements is demonstrated by continuous exhaust gas monitoring.
EGCS acceptance and use to be within the terms and conditions of "Procedure for Compliance" at Para. 6 of HMFP-8398 approved on 12 October 2022 "SOx Emissions Compliance Plan"
Monitoring system is subject to periodic surveys by RINA according to MEPC 259(68)
____________________________ |
|
|
General condition of approval
a) This certificate will not be valid if the manufacturer or user makes any modification to the equipment, which has not been notified to, and agreed with RINA |
|
|
|