Product Description:
The Wärtsilä Water Monitoring System (LM01-01) is arranged for continuous monitoring of PAH, turbidity, pH and
temperature. Variants of the system can be configured with measuring modules for PAH, Turbidity, pH and Temperature as applicable.
The LM01-01 communicates typically with an Exhaust Gas Cleaning System on an Industry standard communication protocol.
Power supply:
Voltage 100…250 VAC
Frequency 45…65 Hz
Power consumption max. 950W
Dimensions:
Size (W x D x H) 500 x 330 x 1250 mm
Weight 52 Kg
Installation conditions:
Ambient temperature Class A (0 … +45°C)
Humidity Class B (Relative humidity up to 100%)
Vibration Class A
EMC Class A
Enclosure Class B (IP54)
Sample liquid:
Sample flow 2 … 5 l/min
Operation Pressure 1 … 3 barg
Design Pressure 3,0 barg
Sample temperature 0 … +40°C
pH value > pH 2,5
Particles max. 2 mm
Measuring:
PAH 0...500μg/l, 0…5000μg/l; PAHPHE EQ 0...80μg/l, 0…800μg/l
Turbidity 0 … 1000 FNU
pH 0 … 14
Temperature 0 … +100°C
Flow 1 … 10 l/min
Test Reports:
- Nemko Test Report No. E22058.00
- DNV Type Approval Test procedure & check list dated 15/10/2021
- DNV FAT signed 15/10/2021
TYPE APPROVAL CERTIFICATE
No. ELE094322XP
Enclosure - Page 2 of 2
LM01-01
Additional Documentation:
- Operation & Maintenance Manual - XAAC283767 rev. 03
- Technical Specification XAAC283763 rev. 03
- XAAC282506 LM01-01 Electrical and PI&D REV -5
- XAAC282353 LM01-01 General Arrangement REV -6
- Certificates: TAE00003WA, TAA000035H, TAA000033H, TAA00002X2_1, TAA00002K0, TAA00002FB_1, TAA00001A3_1, TAA00000VM_3, TAA00000BM_5, 10112_E0 BV
Place of manufacturer:
REMONTOWA ELECTRICAL SOLUTIONS Sp. Z o. o.
U1. Na Ostrowiu 1
80-958 GDANSK
Poland
Remarks:
- The WWM is found compliant with the requirements of Resolution MEPC.259(68) – “2015 Guidelines for exhaust gas cleaning systems” adopted on 15. May 2015, as well as Resolution MEPC.340(77) – “2021 Guidelines for exhaust gas cleaning systems” adopted on 26. November 2021, Chapter 10 “Washwater”.
- For each application the following documentation is to be submitted for approval: functional description, system block diagram including power supply arrangement, list of control and monitored points
- Correct configuration and set up for each delivery to be tested during commissioning after installation.
This approval is granted only on the basis of positive outcome of verifications on board to be carried out by a RINA local surveyor according to the all above mentioned remarks and to all other applicable RINA Rules.