TESTS | STANDARDS |
Plastic test 3) | ISO527,14125,178,14126,14130,62,13003,1183, ASTM D5379 |
Cryogenic test 5) | BS6364 |
Lightweight shock test 2) | MIL-S-901D |
Air test 1) | ISO8178-1,8178-2, MEPC 58/23/Add.1 |
Explosion test 4) | IEC60079 |
Electric test 4) | IEC60060,60034,60945, IEEE C57.12.60, RINA rules, IACS UR E10 |
Luminaire test 1) | IEC60598,61347 |
Dust & Water proof test 1), 4) | IEC60529,60034,60945 |
Flammability test 1) | IEC60695,60092, RINA Rules, IACS UR E10 |
EMC test 1) | IEC61000,60533,60945,60092, CISPR11,14,15,16, MIL-STD 461D, MIL-STD-461E, MIL-STD-461F, MIL-STD-464C, MIL-STD-461G, RINA Rules, IACS UR E10 |
Environment & Reliability test 1), 2) | IEC60068,60945,60092, MIL-STD-810F, MIL-STD-810G, MIL-PRF-28800F, RINA Rules, IACS UR E10 |
Fire resistance test 1), 2) | IMO Res. MSC 307(88):2010 FTP CODE/Annex 1 Fire test procedure
Part 1 Non-combustibility,Part 2 Smoke and Toxicity
Part 3 Test for "A", "B" and "F" class divisions
Part 4 Test for fire door control system,Part 5 Test for surface flammability |
Acoustic noise & signals test 2) | ISO140,357,717,2923,7235,10140,10848, IEC60945, ASTM C423, ASTM E90, ASTM E413, MIL-STD-740-1 |
Vibration test 2) | IEC60945,60068,60092, MIL-STD 167-1A, MIL-STD 740-2, MIL-STD-810F, MIL-STD-810G, MIL-PRF-28800F, RINA rules, IACS UR E10 |
Inclination test 2) | IEC60092, RINA rules, IACS UR E10 |
Aquatic Biology test 3) | APHA AWWA WEF/9215 Heterotrophic plate count
10200 Plankton/2540 Solids
9222 Membrane filter technique for members of the coliform group
UP EPA method 445.0,UP EPA method 1600
UP EPA method 1603,UNESCO Manual on Harmful Marine Microalgae |
*)This Certificate annuals and replaces the Certificate REC100021PU.
Remark :
- Test 1) carried out at Noksan site (24-20, Noksansandan 335-ro, Gangseo-gu, Busan, Republic of Korea)
- Test 2) carried out at Mieum site (35, Mieumsandan 5-ro, Gangseo-gu, Busan, Republic of Korea)
- Test 3) carried out at Gyeongnam site (21-36, Obi 4-gil, Yeoncho-Myeon, Geoje-si, Gyeongsangnam-Do, Republic of Korea)
- Test 4) carried out at Ulsan site (5, Techno saneop-ro 55beon-gil, Nam-gu, Ulsan, Republic of Korea)
- Test 5) carried out at Mieum gas site (41-57, Mieumsandan 5-ro, Gangseo-gu, Busan, Republic of Korea)
General conditions for the approval
- The initial conditions verified by RINA at the time of the assessment are to be maintained
- Any changes to the initial conditions are to be promptly communicated to RINA, which reserves the right to repeat the relevant assessment
- RINA personnel are to be allowed to witness during the performances of activities, upon their request
- The activities are to be carried out in compliance with RINA Rules and /or other applicable Rule
|
|